Tunnel Vault Grouting Material
Specialized grouting material for tunnel construction, designed for void filling, reinforcement, waterproofing and settlement control with excellent flowability and micro-expansion performance.
Packaging & Delivery
| Packaging | 3-ply paper-plastic composite bag | Spec. | 25KG/bag | Volume | 60*40*15cm |
| MOQ | 1000KG | Lead Time | 1-7 working days | Shelf Life | 6 months (unopened, in dry conditions) |
| Trade Terms | FOB/EXW | Payment | T/T / L/C | Port | Shanghai / Ningbo |

Product Overview
Tunnel Vault Grouting Material is a specially formulated cement-based grouting material developed for tunnel construction and underground engineering. It provides excellent pumpability, self-flowing ability and micro-expansion performance to effectively fill tunnel vault voids, reinforce surrounding rock and improve waterproofing performance.
Product Features
Technical Specifications
| Parameter | Value | Test Standard | Test Result | Status |
|---|---|---|---|---|
| Compressive Strength (1d) | β₯25 MPa | GB/T 50448β2015 | 28MPa | Pass |
| Compressive Strength (3d) | β₯40 MPa | GB/T 50448β2015 | 45MPa | Pass |
| Compressive Strength (28d) | β₯60 MPa | GB/T 50448β2015 | 66MPa | Pass |
| Flowability | Initial β₯300 mm / 30min β₯280 mm | GB/T 50448β2015 | Initial 330mm / 30min 295mm | Pass |
| Vertical Expansion Rate (28d) | 0.02%β0.1% | GB/T 50448β2015 | 0.07% | Pass |
| Initial Setting Time | β₯45 min | GB/T 50448β2015 | 60min | Pass |
| Final Setting Time | β€12 h | GB/T 50448β2015 | 9h | Pass |
Advantages
50% Higher Construction Efficiency
Self-compacting, freeze-thaw resistant, highly adaptable to environments. No vibration required, continuous pouring possible, reducing labor costs.
50% Shorter Construction Period
Early strength and high strength, non-shrink with micro-expansion, self-leveling. Compressive strength reaches over 25 MPa in 1 day and 42.5 MPa in 3 days. One-time pouring, simple operation.
50% Lower Cost
Meets design specifications for key projects with guaranteed acceptance. Maintenance-free, reliable delivery, no worries, and long service life.
Applications & Operation Video
Trusted across diverse construction scenarios
Tunnel Vault Void Filling
Injected through high-pressure equipment to fill gaps behind tunnel linings and form a dense filling layer.
Surrounding Rock Reinforcement
Improves the stability of loose surrounding rock and underground structures.
Waterproofing and Anti-Seepage
Used for tunnel sealing, leakage prevention and underground water control.
Click the play button to start the video
Usage Guidelines
Water-to-powder ratio: Follow manufacturer's specified mixing ratio
Working time: Use within 30 minutes after mixing
Curing: Maintain moisture after final set for optimal strength
Construction temperature: Ideally between 5β~35β
Storage & Shelf Life
Storage Condition
Store in a dry, ventilated place, protected from moisture.
Shelf Life
6 months (unopened, in dry conditions)
Successful Partnership Case Studies
Northwest Large-Scale Wind-Solar-Storage Integrated Wind Power Base Project
East China High-Speed Railway Connection Line Project
Southern Pumped-Storage Power Station Foundation Treatment Project
North China Heavy Industry Park Heavy Equipment Foundation Project
Related Products
Explore more products from our professional manufacturing range.
Need Product Selection or Technical Support?
Submit your requirements, our technical team will reply within 24 hours








