Cement Pavement Repair Material
Rapid repair material designed for concrete pavement maintenance, emergency road repairs and infrastructure restoration with fast strength development and excellent bonding performance.
Packaging & Delivery
| Packaging | 3-ply paper-plastic composite bag | Spec. | 25KG/bag | Volume | 60*40*15cm |
| MOQ | 1000KG | Lead Time | 1-7 working days | Shelf Life | 6 months (unopened, in dry conditions) |
| Trade Terms | FOB/EXW | Payment | T/T / L/C | Port | Shanghai / Ningbo |

Product Overview
Cement Pavement Repair Material is a rapid-hardening repair material developed for emergency maintenance of concrete roads, highways, airport runways and industrial floors. It features rapid curing, high bonding strength and excellent durability, helping shorten repair time and restore traffic quickly.
Product Features
Technical Specifications
| Parameter | Value | Test Standard | Test Result | Status |
|---|---|---|---|---|
| Compressive Strength | 1d β₯25 MPa / 3d β₯40 MPa / 28d β₯50 MPa | JT/T 1124-2017 | 1d 28MPa / 3d 45MPa / 28d 55MPa | Pass |
| Flexural Strength | 1d β₯4.5 MPa / 3d β₯6.5 MPa / 28d β₯8.0 MPa | JT/T 1124-2017 | 1d 5.0MPa / 3d 7.0MPa / 28d 8.5MPa | Pass |
| Bond Strength | β₯2.5 MPa | JT/T 1124-2017 | 2.8 MPa | Pass |
| Initial Setting Time | 15β30 min | JT/T 1124-2017 | 20 min | Pass |
| Final Setting Time | 30β60 min | JT/T 1124-2017 | 45 min | Pass |
| Wear Resistance | β€2.0 kg/γ‘ | JT/T 1124-2017 | 1.5 kg/γ‘ | Pass |
| Frost Resistance | No cracks after 20 cycles between -20β and 20β | JT/T 1124-2017 | No cracks after 25 cycles | Pass |
Advantages
50% Higher Construction Efficiency
Self-compacting, freeze-thaw resistant, highly adaptable to environments. No vibration required, continuous pouring possible, reducing labor costs.
50% Shorter Construction Period
Early strength and high strength, non-shrink with micro-expansion, self-leveling. Compressive strength reaches over 25 MPa in 1 day and 42.5 MPa in 3 days. One-time pouring, simple operation.
50% Lower Cost
Meets design specifications for key projects with guaranteed acceptance. Maintenance-free, reliable delivery, no worries, and long service life.
Applications & Operation Video
Trusted across diverse construction scenarios
Urban Road Emergency Repair
Used for rapid restoration of damaged concrete pavement and quick reopening of transportation.
Expressway Repair
Suitable for emergency maintenance of highways requiring short construction periods.
Airport Runway Repair
Provides rapid strength development and wear resistance for airport pavement repair.
Click the play button to start the video
Usage Guidelines
Water-to-powder ratio: Follow manufacturer's specified mixing ratio
Working time: Use within 15-30 minutes after mixing
Application thickness: Suitable for 3-5mm thin-layer repairs
Construction temperature: Suitable for -30β to 60β
Storage & Shelf Life
Storage Condition
Store in a dry, ventilated place, protected from moisture.
Shelf Life
6 months (unopened, in dry conditions)
Successful Partnership Case Studies
Northwest Large-Scale Wind-Solar-Storage Integrated Wind Power Base Project
East China High-Speed Railway Connection Line Project
Southern Pumped-Storage Power Station Foundation Treatment Project
North China Heavy Industry Park Heavy Equipment Foundation Project
Related Products
Explore more products from our professional manufacturing range.
Need Product Selection or Technical Support?
Submit your requirements, our technical team will reply within 24 hours