Rebar Anchoring Material
High-performance anchoring material designed for rebar anchorage, structural reinforcement and construction repair applications with high bonding strength and durability.
Packaging & Delivery
| Packaging | 3-ply paper-plastic composite bag | Spec. | 25KG/bag | Volume | 60*40*15cm |
| MOQ | 1000KG | Lead Time | 1-7 working days | Shelf Life | 6 months (unopened, in dry conditions) |
| Trade Terms | FOB/EXW | Payment | T/T / L/C | Port | Shanghai / Ningbo |

Product Overview
Rebar Anchoring Material is a high-quality building connection material used to enhance anchoring performance in reinforced concrete structures. Manufactured with high-quality materials, it offers excellent strength and durability. In construction engineering, rebar anchoring material effectively connects steel reinforcement with concrete structures, improving overall structural stability and safety. It is easy to use, allowing rapid construction and achieving the desired anchoring effect. Additionally, this product performs excellently in various environments and is widely used in bridges, tunnels, buildings and other fields. In summary, rebar anchoring material is a high-performance, reliable building connection material providing strong support for construction projects.
Product Features
Technical Specifications
| Parameter | Value | Test Standard | Test Result | Status |
|---|---|---|---|---|
| Classification | Cement-based anchoring material | GB 50728β2011 | Complies | Pass |
| Water Bleeding Rate | 0% | GB 50728β2011 | 0% | Pass |
| Chloride Ion Content | Meets GB/T 50476β2008 requirements | GB/T 50476β2008 | 0.03% | Pass |
| Initial Setting Time (Fast Type) | β₯15 min | GB 50728β2011 | 22 min | Pass |
| Final Setting Time (Fast Type) | β€120 min | GB 50728β2011 | 95 min | Pass |
| Initial Setting Time (Normal Type) | β₯45 min | GB 50728β2011 | 65 min | Pass |
| Final Setting Time (Normal Type) | β€360 min | GB 50728β2011 | 270 min | Pass |
| Vertical Expansion Rate | 3d: 0.02%β0.15% / 24h: β€0.3% | GB 50728β2011 | 3d 0.08% / 24h 0.18% | Pass |
| Compressive Strength | 3d β₯30 MPa / 7d β₯40 MPa / 28d β₯50 MPa | GB 50728β2011 | 3d 36MPa / 7d 44MPa / 28d 56MPa | Pass |
| Steel-to-Steel Tensile Shear Strength | Grade A β₯10.0 MPa / Grade B β₯8.0 MPa | GB 50728β2011 | Grade A 11.2MPa | Pass |
| Bond Strength | C30 Concrete β₯11.0 MPa / C40 Concrete β₯13.0 MPa | GB 50728β2011 | C30 12.1MPa / C40 14.3MPa | Pass |
| Operating Temperature | -10β to 40β | GB 50728β2011 | -10β~40β | Pass |
Advantages
50% Higher Construction Efficiency
Self-compacting, freeze-thaw resistant, highly adaptable to environments. No vibration required, continuous pouring possible, reducing labor costs.
50% Shorter Construction Period
Early strength and high strength, non-shrink with micro-expansion, self-leveling. Compressive strength reaches over 25 MPa in 1 day and 42.5 MPa in 3 days. One-time pouring, simple operation.
50% Lower Cost
Meets design specifications for key projects with guaranteed acceptance. Maintenance-free, reliable delivery, no worries, and long service life.
Applications & Operation Video
Trusted across diverse construction scenarios
Bridge Engineering
Used for reinforcement anchoring and structural strengthening in bridge projects.
Railways and Rail Transit
Suitable for reinforcement connections and repair applications.
Hydraulic and Port Engineering
Applied in anchoring and reinforcement of water-related infrastructure.
Click the play button to start the video
Usage Guidelines
Water-to-powder ratio: Follow manufacturer's specified mixing ratio
Working time: Use within 30 minutes after mixing
Curing: Maintain moisture after final set for optimal strength
Construction temperature: Ideally between -10β~40β
Storage & Shelf Life
Storage Condition
Store in a dry, ventilated place, protected from moisture.
Shelf Life
6 months (unopened, in dry conditions)
Successful Partnership Case Studies
Northwest Large-Scale Wind-Solar-Storage Integrated Wind Power Base Project
East China High-Speed Railway Connection Line Project
Southern Pumped-Storage Power Station Foundation Treatment Project
North China Heavy Industry Park Heavy Equipment Foundation Project
Related Products
Explore more products from our professional manufacturing range.
Need Product Selection or Technical Support?
Submit your requirements, our technical team will reply within 24 hours








