High Strength Non-Shrink Grouting Material

High-performance cementitious grout with high strength, excellent flowability and micro-expansion properties for equipment foundations, bridges, wind power projects and structural reinforcement.

β‰₯20 MPa
Compressive (1d)
β‰₯60 MPa
Compressive (28d)
β‰₯300 mm
Initial Flowability

Packaging & Delivery

Packaging3-ply paper-plastic composite bagSpec.25KG/bagVolume60*40*15cm
MOQ1000KGLead Time1-7 working daysShelf Life6 months (unopened, in dry conditions)
Trade TermsFOB/EXWPaymentT/T / L/CPortShanghai / Ningbo
High Strength Non-Shrink Grouting Material

Product Overview

High Strength Non-Shrink Grouting Material is a specially formulated cement-based grout designed for precision installation and structural reinforcement applications. It provides high strength, excellent flowability, micro-expansion and long-term durability.

Product Features

High Early Strength
1d compressive strength β‰₯20MPa, 3d β‰₯40MPa, 28d β‰₯60MPa, effectively shortening construction cycles.
Excellent Flowability
Initial flowability β‰₯300mm, 30min β‰₯260mm, self-leveling and no vibration required, filling complex gaps.
Micro-Expansion Performance
3h vertical expansion rate 0.1-3.5%, 24h 0.02-0.5%, compensating for shrinkage and preventing voids and cracks.
High Flexural Strength
1d flexural strength β‰₯4.0MPa, 28d β‰₯9.0MPa, providing good structural toughness.
High Elastic Modulus
Elastic modulus β‰₯30GPa, meeting the rigidity requirements for precision equipment installation and structural reinforcement.
Zero Water Bleeding
Water bleeding rate 0%, ensuring stable slurry without segregation, guaranteeing grouting quality.

Technical Specifications

ParameterValueTest StandardTest ResultStatus
Particle SizeResidue on 4.75 mm sieve ≀2.0%GB/T 50448-20151.2% Pass
Setting TimeInitial β‰₯120 min / Final ≀360 minGB/T 50448-2015Initial 180min / Final 300min Pass
FlowabilityInitial β‰₯300 mm / 30 min β‰₯260 mmGB/T 50448-2015Initial 340mm / 30min 290mm Pass
Flexural Strength1d β‰₯4.0 MPa / 28d β‰₯9.0 MPaGB/T 50448-20151d 5.0MPa / 28d 10.5MPa Pass
Compressive Strength1d β‰₯20 MPa / 3d β‰₯40 MPa / 28d β‰₯60 MPaGB/T 50448-20151d 25MPa / 3d 48MPa / 28d 68MPa Pass
Vertical Expansion Rate3h: 0.1–3.5% / 24h: 0.02–0.5%GB/T 50448-20153h 0.5% / 24h 0.1% Pass
Elastic Modulusβ‰₯30 GPaGB/T 50448-201535 GPa Pass
Chloride Ion Content≀0.06%GB/T 50448-20150.02% Pass
Water Bleeding Rate0GB/T 50448-20150% Pass

Advantages

⚑

50% Higher Construction Efficiency

Self-compacting, freeze-thaw resistant, highly adaptable to environments. No vibration required, continuous pouring possible, reducing labor costs.

πŸ›‘οΈ

50% Shorter Construction Period

Early strength and high strength, non-shrink with micro-expansion, self-leveling. Compressive strength reaches over 25 MPa in 1 day and 42.5 MPa in 3 days. One-time pouring, simple operation.

πŸ’°

50% Lower Cost

Meets design specifications for key projects with guaranteed acceptance. Maintenance-free, reliable delivery, no worries, and long service life.

Applications & Operation Video

Trusted across diverse construction scenarios

1

Equipment Foundation Grouting

Used for secondary grouting of machine tools, presses, pumps, fans and precision equipment foundations.

2

Steel Structure Anchorage

Suitable for fixing steel columns, steel frames, steel rails and other structural components.

3

Bridge and Transportation Engineering

Applied in bridge bearing grouting, track foundations and emergency road repairs.

Click the play button to start the video

Usage Guidelines

β€’

Water-to-powder ratio: Follow manufacturer's specified mixing ratio

β€’

Working time: Use within 30 minutes after mixing

β€’

Curing: Maintain moisture after final set for optimal strength

β€’

Construction temperature: Ideally between 5℃~35℃

Storage & Shelf Life

Storage Condition

Store in a dry, ventilated place, protected from moisture.

Shelf Life

6 months (unopened, in dry conditions)

Successful Partnership Case Studies

Northwest Large-Scale Wind-Solar-Storage Integrated Wind Power Base Project

Category: Onshore Wind Turbine Foundation Grouting
Product: Wind Power High-Strength Grouting Material
Quantity: 5,500 tons
Location: Barkol, Xinjiang
Summary: Used for the connection between turbine foundations and tower bases.

East China High-Speed Railway Connection Line Project

Category: High-Speed Railway Bridge Bearing Reinforcement Grouting
Product: Bridge Bearing Special Grouting Material
Quantity: 4,000 tons
Location: Nanjing, Jiangsu
Summary: A key regional high-speed railway project, supplying bearing grouting materials.

Southern Pumped-Storage Power Station Foundation Treatment Project

Category: Hydropower Station Equipment Base Grouting Reinforcement
Product: Underwater Non-Dispersible Grouting Material
Quantity: 3,890 tons
Location: Qingyuan, Guangdong
Summary: A large domestic pumped-storage power station, supplying grouting for unit base equipment.

North China Heavy Industry Park Heavy Equipment Foundation Project

Category: Large Mechanical Equipment Secondary Grouting
Product: Early-Strength High-Strength Grouting Material
Quantity: 4,517 tons
Location: Dagang, Tianjin
Summary: A heavy equipment manufacturing park, supplying grouting for large unit equipment bases.

Need Product Selection or Technical Support?

Submit your requirements, our technical team will reply within 24 hours