Tunnel Engineering Applications
Tunnel Engineering

Reliable Grouting Solutions for Tunnel Support and Backfill

Grouting materials for vault backfill, void filling behind the lining, water leakage treatment and initial support anchoring, supported by on-site technical guidance.

Tunnel Grouting Solutions

Voids behind the lining, uncompacted vault backfill and water leakage are the main issues affecting structural safety and long-term durability in tunnelling. Our grouts combine high flowability, zero bleeding and micro-expansion so they fill narrow voids completely and compensate shrinkage, making them suitable for backfill, anchoring and sealing works in mountain tunnels, shield-driven metro lines and railway tunnels.

ISO 9001CE MarkingGB/T 50448

Key Parameters

Compressive Strength (28d)
β‰₯60.0 MPa
Initial Flowability
β‰₯320 mm
Bleeding Rate
0%
Vertical Expansion Rate
β‰₯0.020%
Initial Setting Time
β‰₯120 min
Test Standard
GB/T 50448

Tunnel Engineering Applications

Covering the main grouting stages of tunnel construction

πŸš‡

Vault Backfill & Void Grouting

Fills voids behind the lining so the support structure stays in contact with the rock mass.

πŸ”©

Steel Arch & Anchor Anchoring

High-strength early-strength grout for rapid anchoring of initial support elements.

πŸ’§

Water Leakage Treatment

Suitable for grouting cracks, construction joints and deformation joints in tunnel linings.

πŸš‰

Metro & Railway Tunnels

Meets durability and impermeability requirements of metro and railway tunnel projects.

Why Choose Jianghuai for Tunnel Grouting

Complete filling, durable performance, easier application

πŸ’§

High Flow, Zero Bleeding

Flowability β‰₯320 mm with 0% bleeding fills narrow voids behind the lining completely.

πŸ›‘οΈ

Water and Freeze Resistance

Stable performance in wet strata and under freeze-thaw cycles, suitable for underwater sealing.

πŸ“

Micro-Expansion, No Shrinkage

Expands slightly after hardening, compensating shrinkage and keeping contact with rock and lining.

Need Grouting Materials for a Tunnel Project?

Tell us the geology and construction stage, and our technical team will recommend the mix and method.